(New page: == Building the Veggie Garden == Building a Vegetable Garden seemed like such an easy idea! First a simple plan! Then a bunch of materials and Assemble: http://pattersonweb.org/pics/v...)
 
Line 16: Line 16:
 
http://pattersonweb.org/pics/view/thumbgen.php?outputwidth=790&dirname=../2008/may&filename=P1010336.JPG
 
http://pattersonweb.org/pics/view/thumbgen.php?outputwidth=790&dirname=../2008/may&filename=P1010336.JPG
  
Next we, [[Jenny]] and [[Josh|I]], trucked in 3 cubic yards of dirt. All by hand in our tiny wheelbarrow: Ok, well maybe not that tiny, but its not a huge wheelbarrow...
+
Next we, [[Jenny]] and [[Josh|I]], trucked in 3 cubic yards of dirt. All by hand in our tiny wheelbarrow: http://pattersonweb.org/pics/view/thumbgen.php?outputwidth=300&&dirname=../2008/april&filename=P1010152.JPG Ok, well maybe not that tiny, but its not a huge wheelbarrow...
  
 
The last bit was to install plastic in the pathways and dump 1/2 cubic yards of pea gravel on it. The pea gravel was brought in via [[http://paulandangelasfamily.blogspot.com/ Paul Jenkin's]] Truck! Thanks Paul
 
The last bit was to install plastic in the pathways and dump 1/2 cubic yards of pea gravel on it. The pea gravel was brought in via [[http://paulandangelasfamily.blogspot.com/ Paul Jenkin's]] Truck! Thanks Paul
 +
 +
--Josh 18:51, 25 May 2008 (UTC)

Revision as of 13:52, 25 May 2008

Building the Veggie Garden

Building a Vegetable Garden seemed like such an easy idea!

First a simple plan!

Then a bunch of materials

and Assemble:

may&filename=P1010272.JPG may&filename=P1010250.JPG may&filename=P1010266.JPG

Some had it easier then others! The first step involved Splitting 23 landscape timbers in half... lengthwise; It turned out they were really really wet! We started on the bandsaw, but the sap was so thick that we totally junked up the blade, and could barely get out of the last log w/o destroying the blade. So we fell back on the tried and true circular saw! Its a log of work since you have to cut each timber twice lengthwise since the saw doesn't cut all the way through! Don did half, and I did the other half. In the meantime we stretched out over 200 feet of chicken wire that got laid down under the beds to help keep out voles! Then they all got screwed together in our x shaped bed plan. may&filename=P1010336.JPG

Next we, Jenny and I, trucked in 3 cubic yards of dirt. All by hand in our tiny wheelbarrow: april&filename=P1010152.JPG Ok, well maybe not that tiny, but its not a huge wheelbarrow...

The last bit was to install plastic in the pathways and dump 1/2 cubic yards of pea gravel on it. The pea gravel was brought in via [Paul Jenkin's] Truck! Thanks Paul

--Josh 18:51, 25 May 2008 (UTC)